Fabrication · Certificates

Fabcert › Guides

EN 10204 3.1 certificate: how to check it in 8 steps

Updated:

A 3.1 inspection certificate is the document that proves the steel you received is the steel you ordered. Under EN 1090 it is also the link between a finished component and its material. Here is what it is and how to check it quickly at goods-in.

What “3.1” means

EN 10204 defines the types of inspection documents for metallic products:

EN 1090-2 sets which document type is required, depending on the product and steel grade. For most structural steel used in EN 1090 work, shops receive 3.1. Check the requirement for your grades in the standard or with your welding coordinator.

8 checks at goods-in

  1. Document type. The certificate states “EN 10204 3.1” (or 3.2), not 2.2.
  2. Heat number. The heat (cast) number on the certificate matches the one on the tag, stamp or paint marking on the steel – digit by digit.
  3. Delivery note. The same heat number and quantity appear on the delivery note.
  4. Grade and standard. Grade and product standard match your order, e.g. S355J2+N to EN 10025-2. A different quality suffix (JR instead of J2) is a different product.
  5. Dimensions. Profile, thickness and size match what was delivered.
  6. Chemical composition. Values (and the carbon equivalent CEV, if given) are within the limits of the product standard.
  7. Mechanical properties. Yield strength, tensile strength and elongation meet the minimums for the thickness; for J0/J2/K2 grades the impact test is at the right temperature (e.g. J2: 27 J at −20 °C under EN 10025-2).
  8. Validation. The document is validated by the inspection representative and refers to your order or to the stockist’s order.

When the steel comes from a stockist

Most small shops buy from stockists, not mills. A stockist that cuts or splits a delivery should pass on the mill’s certificate unchanged, together with a way to identify which product it belongs to. If the certificate covers several heats, find the line for your heat. If the stockist adds its own document, keep both.

Common problems

Why it matters at the FPC audit

Auditors check that materials can be traced to their inspection documents. Under the certification rules of one notified body (Intertek, 2023), incomplete or wrong material inspection documents are a listed reason for more frequent surveillance, and an unresolved major nonconformity can lead to suspension of the certificate for up to 6 months, during which CE marking is not allowed.

Keep a register, not a pile of PDFs

Write each check into your material register: date, delivery note, heat, grade, dimensions, certificate type, result. That is the table your auditor will ask for. You can build it in Excel – or let the free tool read the certificate for you.