Fabcert › Guides
Material traceability under EN 1090: a practical guide for small shops
Updated:
Traceability means you can show which material – which heat, with which certificate – went into a component. EN 1090 asks for it as part of factory production control (FPC). Here is how it works in practice in a small shop, step by step.
What the standard asks for, in short
- Constituent products must be identifiable from receipt to use.
- The level depends on the execution class. For EXC3 and EXC4, materials must be traceable at all stages, and finished components identified to their inspection documents.
- For EXC2, identification is required too; how detailed it must be (piece or batch) is best agreed with your notified body. Many shops trace by batch at EXC2.
Always check the exact wording in EN 1090-2 and your own FPC manual.
The 5 points where the link breaks
- Goods-in. The heat number is read from a tag, stamp or paint marking and written on the delivery note. A wrong digit here breaks everything after it.
- Certificate arrives later. The 3.1 certificate often comes days after the steel, by email or on paper, and must be matched to the right bundle.
- Storage. Chalk fades, paint gets covered, bundles get split.
- Cutting. Every piece and remnant has to carry the heat number of its parent material (stamp, paint pen, label or cutting list).
- Handover. The client file needs the material register with certificates.
A simple system that auditors understand
- One register. One row per delivered item: date, supplier, delivery note number, heat number, grade, dimensions, quantity, certificate type and file name.
- Check at goods-in. Heat on the steel = heat on the delivery note = heat on the certificate; grade = order. Block anything that doesn’t match.
- Name files by heat. e.g.
24A1187_S355J2_HEB200.pdf, so a search finds them. - Mark before cutting. Transfer the heat number to every piece and remnant before it leaves the cutting area.
- Link pieces to jobs. For each job, list piece marks and the heat they came from.
- Test it. Once a month, pick a random beam in the yard and find its certificate. If it takes more than a few minutes, the auditor will notice too.
What happens if it fails
Under the certification rules of one notified body (Intertek, 2023), a major nonconformity must be closed in a set time, may require an extra paid audit, and if unresolved can lead to suspension of the certificate for up to 6 months – with no CE marking allowed during that time.
Paper, Excel or software?
All three can work if the register is complete. Paper and Excel cost nothing, but the time goes into copying numbers and searching for PDFs. Software helps most at the two weak points: reading the heat number at goods-in and keeping the link after cutting.
This guide is general information, not a substitute for the standard text or the advice of your welding coordinator or notified body.
The Fabcert app is in development: see what we are building →